Pilz PSENvip RL D P Instrukcja Użytkownika Strona 86

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 139
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 85
7.2 Initial commissioning
7 Commissioning
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]
7-4
Guidelines for the mechanical alignment of transmitter and receiver:
When making the alignment, the nuts on the bolt connecting the
PSENvip to the adjustment plate should only be hand-tightened.
There are three notches on the adjustment plate and auxiliary adjust-
ment plate for rotating the transmitter and receiver. The transmitter or
receiver is inserted into the slot holes on the adjustment plate (adjust-
ment direction B).
Push the screwdriver blade into the middle notch of the auxiliary ad-
justment plate and adjustment plate.
Rotate the screwdriver blade in the required direction.
You can use the left or right-hand notch to rotate the transmitter or
receiver even further to the left or right.
Fig. 7-3: Adjustment direction B
Direction What?
A Move horizontally within the groove of the adjustment plate
B Rotate on a horizontal plane within the slot holes of the ad-
justment plate
C Move vertically by adjusting the nuts on the bolts
Przeglądanie stron 85
1 2 ... 81 82 83 84 85 86 87 88 89 90 91 ... 138 139

Komentarze do niniejszej Instrukcji

Brak uwag