Commissioning
Operating Manual PNOZ mmc7p CC
1003066-EN-01
13
Interface assignment
It is possible to define which outputs on the safety system will communicate with CC-Link.
The connection to CC-Link is made via a 5-pin screw connector.

 

  





1: DA (Channel A)
2: DB (Channel B)
3: DG (Earth)
4: SLD (Cable shield)
5: FG/PE (Functional earth)
Download modified project to the PNOZmulti safety system
As soon as an additional expansion module has been connected to the system, the project
must be amended using the PNOZmulti Configurator. Proceed as described in the operat-
ing instructions for the base unit.
NOTICE
For the commissioning and after every program change, you must check
whether the safety devices are functioning correctly.